What East Bay home sellers must do before closing

If you're selling a home in Oakland, Berkeley, Alameda, Albany, Emeryville, Piedmont or El Cerrito, you'll need a sewer lateral certificate before escrow can close. Oakland also requires a sidewalk certificate, and Berkeley now requires a Home Energy Score before you list. On top of that, California has a short list of safety items every seller has to confirm.

None of this is hard, but some of it takes weeks, and sellers who learn about it after accepting an offer can lose time or money. Here's what each requirement is, where it applies, and when to start.

The sewer lateral certificate

Your sewer lateral is the private pipe that carries wastewater from your house to the city sewer main. Cracked laterals let rainwater into the sewer system, so East Bay cities require sellers to prove theirs is in good shape before the sale closes.

Where it applies. Two programs cover most of the inner East Bay:

ProgramCities
EBMUD Regional Private Sewer Lateral ProgramOakland, Alameda, Albany, Emeryville, Piedmont, and the Stege Sanitary District (El Cerrito, Kensington and the Richmond Annex)
City of Berkeley Private Sewer Lateral ProgramBerkeley

What triggers it. Selling or otherwise transferring the property, a building or remodel project over $100,000, or changing the size of your water meter. It applies to condos too, though in many buildings the HOA handles it.

How it works.

  1. Check your property's status. A valid certificate may already be on file. EBMUD's program has an online property search at eastbaypsl.com.
  2. Hire a licensed plumbing contractor to inspect the lateral and make any repairs or replacement, with city permits if needed.
  3. The contractor schedules a verification test, witnessed by an EBMUD or City of Berkeley inspector.
  4. Once it passes, you receive a compliance certificate.

How long it lasts. In the EBMUD program, a certificate is good for 7 years if the lateral passed as is or was repaired, and 20 years if it was fully replaced.

If you can't finish before closing. Both programs offer a time extension, which lets the sale close while the work is finished afterward:

EBMUD citiesBerkeley
Extension180 days after it's issuedSix months after close of escrow
Deposit$4,500, refundable$4,500, refundable, or a signed contract with a licensed plumber
The depositDeposit refunded once the certificate is issuedRefunded with the certificate; forfeited if the work isn't done in six months, and the city does the work and bills the owner

When to start: before you list. If the lateral needs repair or replacement, you'll want time for permits, the work and the re-test, and knowing the result up front keeps it out of the negotiation.

Oakland: the sidewalk certificate

Since July 2019, Oakland has required sellers to have the sidewalk in front of the property inspected and, if needed, repaired before title transfers.

  • What counts as a defect: a crack, depression or vertical offset of more than a quarter inch.
  • Who can certify it: a licensed contractor, professional engineer or licensed architect. Small repairs (grinding, or replacing under 25 square feet) can be done by the owner, but a licensed professional still has to certify. Bigger repairs need a licensed contractor with a city repair permit.
  • Cost to file: about $109 as of September 2025, plus any repair permit.
  • How long it lasts: five years.
  • If repairs aren't done by closing: a provisional certificate, issued before closing, gives 120 more days, with up to two more 120-day extensions. Buyer and seller decide in the contract who finishes the work.
  • Exempt transfers include transfers into a trust, between spouses or co-owners, during estate administration, and through foreclosure. If an HOA maintains the sidewalk, the HOA is responsible.

Berkeley: the Home Energy Score and BESO upgrades

Starting January 1, 2026, anyone selling a single-family home or duplex in Berkeley must:

  1. Get a Home Energy Score before listing from a registered BESO assessor, post it in the MLS listing and include the report in the disclosures. Skipping it carries a $500 fee.
  2. Before closing, choose one of three paths:
    • Do the upgrades: earn at least six "credits" per unit from energy upgrades, including any done in the past five years, then file for a BESO certificate ($150).
    • Use an exemption: homes already served by a heat pump water heater or heat pump heating and cooling, all-electric homes, and certain income-qualified first-time buyers.
    • Defer to the buyer: seller and buyer each deposit $2,500 with the city ($5,000 total). The buyer then has two years to earn the six credits, with a one-year extension available, and gets the $5,000 back when done.

Some upgrades earn all six credits by themselves, like a heat pump water heater, a heat pump heating and cooling system, or an electrical panel upgrade. Others earn fewer: solar or a battery earns 3, an EV charger or induction range earns 2, and attic insulation earns 2.

Triplexes and fourplexes follow the same rules starting in 2028.

Berkeley also offers a transfer tax rebate: buyers or sellers can get back up to a third of the city's base 1.5% transfer tax for qualifying voluntary seismic work, like foundation bolting and shear walls. My Oakland transfer tax guide covers Berkeley's transfer tax and the increase coming January 1, 2027.

What California requires on every sale

These apply anywhere in the state, and you certify them in writing to the buyer:

  • Smoke alarms. Working smoke alarms that meet state standards. California requires the seller to give the buyer a written statement of compliance.
  • Carbon monoxide alarms. Required in homes with a gas appliance, fireplace or attached garage.
  • Water heater strapping. Every water heater must be braced, anchored or strapped against earthquakes, and the seller certifies this in writing.
  • Water-saving plumbing fixtures. Single-family homes built before 1994 must have water-conserving toilets, showerheads and faucets, and the seller must disclose whether any older fixtures remain.

These are usually quick fixes. I check them during the listing walk-through so they're done before the first showing.

Disclosures you'll provide

Beyond the certificates, you'll fill out the standard California disclosure package, including the Transfer Disclosure Statement, a Natural Hazard Disclosure report, and lead-based paint disclosures for homes built before 1978. Local disclosures cover things like the requirements in this guide.

The rule of thumb: if you know about something that affects the home's value or desirability, disclose it. When in doubt, ask me or your attorney before you leave it out.

Seller checklist

WhenWhatWhere
Before listingCheck sewer lateral status; hire a contractor to inspect and testOakland, Berkeley, Alameda, Albany, Emeryville, Piedmont, El Cerrito, Kensington
Before listingGet a Home Energy Score and post it in the MLSBerkeley
Before listingHave the sidewalk inspectedOakland
Before listingCheck smoke and CO alarms, water heater strapping and plumbing fixturesEverywhere in California
In escrowFinish repairs, or set up the sewer extension, Oakland provisional sidewalk certificate or Berkeley BESO deferralWhere it applies
Before closingDeliver certificates and disclosures to escrowEverywhere

Questions sellers ask me

Can the buyer take on the sewer lateral work instead of me? Yes, through a time extension. In the EBMUD cities and Berkeley, a $4,500 refundable deposit lets the sale close while the work is finished afterward. Who pays for the work is part of the negotiation.

My lateral was replaced a few years ago. Do I need to do it again? Maybe not. In the EBMUD program, a certificate for a fully replaced lateral is valid for 20 years, and one for a repaired or passing lateral is valid for 7. Check your property's status before hiring anyone.

Does Berkeley make me install a heat pump before I sell? No. You need the Home Energy Score before listing, but you can either do the upgrades or defer them to the buyer with a $5,000 deposit split between you.

I'm selling a condo. Do these apply? The state requirements do. For the sewer lateral and Oakland's sidewalk, it depends on what your HOA maintains under its rules, so we'd check your HOA documents.

What about cities that aren't listed here? Some cities have their own requirements, and others have none beyond the state's. Tell me your address and I'll check what applies.

Thinking about selling?

Before you list, I'll check which of these apply to your home, line up the inspections, and build the results into your pricing and timeline, so nothing surprises you in escrow. When you hire me, you work with me.

Text me at 510-381-0988 or call 510-545-6932.

Sources

General information, not legal advice. Requirements checked November 28, 2026.

More guides